Installed over a 3 day period featuring nearby wildfires, microbursts and record high and low temperatures. The Oath Totem was crafted from two steel pressure vessel hemispheres, pipe, and aluminum tubing finished in silver mylar. The walkable base structure was camouflaged with live sod. 

PROJECT MANAGER


  • Collaborated with Project Engineer for stamp and facility safety requirements. 
  • Coordinated powdercoatings and mylar finishes.
  • Led on-site installation with local stagehand crews.